Phase 1 A 105,300 sq.m. terminal, having the capacity to handle 12 million passengers per annum has been constructed. The terminal building has 12 contact and 30 remote stands for aircraft parking. Other buildings, including the ATC Tower (Air Traffic Control Tower), Technical Building, Cargo (100,000 metric tones capacity), CFR Station (Crash, Fire and Rescue Station) and Utilities have also been constructed.
Click on the image to enlarge
Final Phase
The airport will reach its full maturity in this Phase. An additional floor area of 430,000 sq.m. will be constructed bringing the total built up area to 900,000 sq.m.
The ultimate master plan is to cater over 40 million passengers per annum. To achieve this, the present master plan allows freedom of expansion to both airside and landside facilities within the Airport site. Further acquisition of land to the north and south will allow expansion of a third and fourth runway system.